You own a block or an older house
Knock down and rebuild, or build on vacant land. We look at what the block can carry under the rooming house rules, then design and price it with you.
Rooming houses
Rooming houses are our specialty. We design and build them for investors across Melbourne, and the director runs every one from the first conversation to handover.

A rooming house is built to rent by the room. Most are designed as a Class 1b building, which caps the floor area at 300 m² and the number of residents at 12. Every one we’ve built sits just under that limit, because the whole design is about fitting the most usable rooms into it.
That makes the planning the hard part. Room sizes, ensuites, the shared kitchen and laundry, parking, accessible access and fire safety all have to work together on one block. We sort that out with the designer and the building surveyor before the slab is poured, so you’re not paying for changes halfway through.
If you already have plans, we’ll price and build from them. If you’re starting with a block and a budget, we’ll help you get to plans first.
Knock down and rebuild, or build on vacant land. We look at what the block can carry under the rooming house rules, then design and price it with you.
Send us the address before you sign. Width, slope, easements and the planning controls decide how many rooms fit, and it’s cheaper to find that out first.
If your designer has drawn it and you have a permit or are close to one, we price from your drawings and build it as drawn.
Burwood, Mill Park, Sunshine West and Laverton.
“This was my first time building a rooming house and the process was so smooth.”
We look at the block, what you want to spend and how many rooms you’re after, and tell you straight whether it stacks up.
Working drawings, engineering, energy rating and the building permit, with the building surveyor involved from the start.
A clear scope, a fixed price and a start date. Progress claims follow the contract stages.
Slab to lock-up to fit-out, run by the director, with regular updates and photos as it goes.
Final inspection, occupancy permit, certificates and manuals. We stay available through the defects period.
We design and build right up to what Class 1b allows, so you get the rooms the block can carry and nothing has to be cut back at permit stage.
The building permit, inspections and the occupancy permit are ours to organise. You get the certificates and documents at handover.
The director runs every job. You get straight answers and regular updates, and progress claims follow the contract. See how a build runs.
In Victoria it’s a building where rooms are rented out separately to four or more people, who usually share a kitchen, laundry or living area. New ones are purpose-built for it.
It depends on the block. A Class 1b rooming house is limited to 300 m² of floor area and 12 residents, and we’ve built up to nine bedrooms, each with its own ensuite, inside that.
A single-storey rooming house takes us five to eight months from building permit to occupancy permit. Two storeys take longer. Design and approvals come before that and vary with the site.
No. We’re the builder, so you bring the block. If you’re looking at one, we’re happy to give you our view on it before you buy.
No. We build it and hand it over with the occupancy permit and all the paperwork. Registering and running it is up to you or your property manager.
Yes. If you already have drawings and engineering we work from those. If not, we organise them.
Thinking of building?